The equipment is only part of the bid
Installers can quote the same unit and still land far apart on price because of what surrounds it. A line set that needs replacing instead of reusing, a pad that needs releveling, a disconnect box that no longer meets code. The unit on the spec sheet is easy to compare. What it takes to actually set it in place is where bids split.








